Back to ProjectsEngineering Design

2 MW Ground Mount Design

Queensland
2 MW
2023
2MW ground mount solar system – Engineering design drawings – QLD

Project Overview

AGILE Team delivered comprehensive engineering design and drafting for a 2 MW solar farm, including geo-referenced drawings, site layout, module layouts, detailed solar arrays, electrical asset overviews, and fencing. Our detailed engineering drawings provided the foundation for a successful project tender and construction phase. The designs incorporated the latest industry standards and best practices, ensuring optimal energy production while maintaining compliance with Queensland regulatory requirements.

Key Highlights

Complete geo-referenced drawings
Detailed electrical asset layouts
Module layout optimization
Compliance with QLD standards

Services Provided

  • Engineering Design
  • CAD Drafting
  • Site Layout Planning
  • Electrical Design

Project Details

Location
Queensland
System Capacity
2 MW
Category
Engineering Design
Year
2023

Have a Similar Project?

Let's discuss how we can help

Get in Touch

Ready to Transform Your Energy Projects?

Our expert team of Engineers and Project Managers are dedicated to providing tailored engineering and project management solutions that drive the success of your renewable energy projects across Australia.